07 General Plant Description

ERC General Plant Description for COC independent power producer/DU owned power plant

Your Browser Doesn't Support Canvas. Showing the Text Content of the PDF Instead: FORM NO. 7

GENERAL PLANT DESCRIPTION
Name of Generating Company/Facility: _____________________________________
1. Plant Geographical Location:____________________________________________
____________________________________________
2. Type and Number of Plant installed:______________________________________
______________________________________
3. Installed Capacity in MW: ______________________________________________
4. Plant Factor in percent: ________________________________________________
5. Maximum/ Minimum Stable Load (MW)___________________________________
6. Ramp Up / Ramp Down Rate (MW/Minute)________________________________
7. Heat Rate (if applicable) ________________________________________________
8. Annual Generation in GWH: ____________________________________________
9. Fuel type: ____________________________________________________________
(Main Fuel & Start-up Fuel)
10. Fuel Source/Cost of Fuel: ______________________________________________
11. Point of Interconnection: ______________________________________________
12. Source of Fresh Water: _______________________________________________
13. Construction Period in months: _________________________________________
14. Economic Life in years:

_____________________________________________

15. Oil Equivalent in million barrels(Fuel): __________________________________
16. Percent contribution to the Luzon Grid: _________________________________
17. Percent contribution to the entire Grid: __________________________________
18. Estimated Project Cost: _______________________________________________
19. Date of Commissioning: _______________________________________________

1

FORM NO. 7
20. Plant Efficiency: ______________________________________________________
21. Description and rated capacity of substation/switchyard and metering
equipment:
_____________________________________________________________________
_____________________________________________________________________
22. Description of its communication and SCADA equipment:
_____________________________________________________________________
_____________________________________________________________________
23. Spinning Reserve Level in MW:
______________________________________
____________________________________________________________________
24. Handling and disposal of dangerous waste and substances: __________________
_____________________________________________________________________
25. Contingency measures in case of flood, typhoon, etc. _______________________
_____________________________________________________________________
Description of the Specific Technical Data For Coal Plants:
26. Coal Unloader Capacity & Type: ________________________________________
27. Coal Yard Description: ________________________________________________
28. Pulverizer: __________________________________________________________
29. Ash Handling System: _________________________________________________
30. Stacker/Reclaimer: ___________________________________________________
31. Electrostatic Precipitator: _____________________________________________

Technical description of Thermal(Coal) and/or Geothermal plants:
32. Steam Generator type:_________________________________________________
(Nameplate data)
33. Steam Turbine Type:__________________________________________________
(Nameplate data)

2

FORM NO. 7
34. Condenser Type : _____________________________________________________
(Nameplate data)
Technical Description for Hydro Power Plants
35. General Water Appropriation: (Please check)
____ Domestic
_____ Fisheries
____ Municipal
_____ Livestock raising
____ Irrigation
_____ Industrial
____ Power Generation
_____ Recreational
____ Others, please specify:
_________________
36. General Land Classification of the Project areas: (Please check)
____ Public Land
_____ Privately owned land
37. Present Land Use Classification: (Please check)
_____ Agricultural
_____ Industrial
_____ Commercial
_____ Forest Land
_____ Open Spaces
_____ Tourism
_____ Institutional
_____ Others, please specify:
______________
38. Project Components
a) Relevant Dimensions
Plant Capacity in MW
Max. Plant Discharge in Cubic meter per second
Min. Plant Discharge in Cubic meter per second
Max. Headwater Level meters at sea level
Min. Operating Headwater Level
Tailrace Water Level
Estimated Net Head:
Total Storage Volume in cubic meters

: ______________________
: ______________________
:_______________________
: ______________________
: ______________________
: ______________________
: ______________________
: ______________________

b) Structures and Buildings: Description and Specifications
Reservoir
Waterways
Turbines
Generators
Switchyard equipment
Penstock
Powerhouse
Other Structures

: ________________________________________
: ________________________________________
:_________________________________________
: ________________________________________
: ________________________________________
: ________________________________________
: ________________________________________
: ________________________________________

3

FORM NO. 7
Note: Please provide additional sheet(s) if necessary.
-----------------------------------------------------------------------------------------------------------Name of person who provided the above information: _______________________
Signature: _______________________
Date Accomplished: ______________
Res. Cert. No. ____________________
Date Issued : _____________________
Place Issued: _____________________
JSJ\COCForms\genplantdesc7.doc